I'd like to ask whether we have such an option like retry to send SQL backup file to the remote server if the previous job was failed in the case of network disaster that hapened before the scheduled time.
For example, if I schedule the backup runs at 23:00 but network is down between 22:30-23:30 because of the net failure. In this case how can we ensure that job was executed after the issue is solved.