|
|
|
Rank: Newbie
Groups: Registered
Joined: 2/3/2012 Posts: 1 Location: London
|
Hi
We've bought the software recently and it looks to be just what we need, but I have just tried to set up a new schedule to do a full backup of all our databases on Sunday evening (today is Friday) at 21:00 and then a differential every day at 21:00. As today is Friday and I don't want the full backup to run until Sunday I want to delay the schedule in effect.
Is this possible or would I have to start the schedule on the actual day I want it to run?
Thanks!
|
|
|
|
Rank: Administration
Groups: Administrators
Joined: 8/12/2009 Posts: 271
|
As a quick solution I'd suggest you the following:
1) Wait until Sunday 2) On Sunday at any time before 21:00 open your job, select "Lazy" backup scenario in Advanced Scheduling Settings and set Full backup to start at 21:00 3) Save the job and make sure that it scheduled at 21:00
That's it!
|
|
|
|
Rank: Guest
Groups:
Joined: 8/10/2009 Posts: 733
|
Thanks for the reply, but if I worked on Sundays I wouldn't have asked how to postpone the backup until then.
|
|
|
|
|